In practice

IT infrastructure modernisation

Manufacturing company · client identity withheld

A manufacturer with laboratory teams, specialist equipment, offices and warehouses. Its IT includes workstations, instruments, physical and virtual servers, 1C, analytics integration, Microsoft 365, access and attendance control, and wired and wireless networks. The project ran in 2024–2025, with some stages completed in 2026.

Business need

IT had evolved gradually, but accumulated technical and organisational limitations threatened continuity. Network and internet outages lasted 20–240 minutes; diagnostics took hours or days. Critical network devices were single points of failure, some data lacked independent backups, and limited documentation and central management increased dependence on individual specialists. The goal was a reliable, secure, transparent and manageable infrastructure.

The IT Director's approach as a business partner

The IT Director defined the target architecture and coordinated connected work: diagnosing root causes, prioritising downtime risks, standardising and documenting, upgrading and providing network redundancy, improving data and access security, removing everyday obstacles and formalising support. The goal was to reduce operational risk and business downtime.

Business outcomes

Recurring prolonged internet outages were practically eliminated. Automatic failover to the backup connection was configured, with up to one second reported. Estimated or tested recovery for a central-router failure fell from eight working hours to 30 minutes; for the central switch, from six hours to 15 minutes. Some diagnostics fell from hours or days to minutes. Printing and scanning issues decreased, Wi-Fi coverage improved, and security and independent backups were strengthened. These figures describe specific scenarios and tests, not statistics for every incident.

Why the approach is integral

Reliable internet required work across cabling, switches, routers, the provider and diagnostic procedures. Backup equipment became a practical continuity measure through instructions and failover tests. Data protection connects storage architecture, backup schedules, power and server checks. Here, integral means aligning technology, processes, people, security and management decisions around business needs.

Story 1. From an opaque network to manageable infrastructureRead more

Before
Inventories and diagrams were incomplete, device names were inconsistent, cables were unlabelled and central devices were above a suspended ceiling.

Implemented
Inventory, standard device names and IP addressing, cable labelling, floor plans and network diagrams, a communications cabinet with a patch panel and UPS, cable tracing and repairs, and managed Layer 3 switches.

Outcome
Faster fault isolation, remote diagnostics and the ability to disconnect faulty segments. Business value: less downtime and dependence on an engineer's individual knowledge.

Story 2. Practically eliminating prolonged internet outagesRead more

Before
Long outages originated in both the local network and the provider's service; critical network devices had no redundancy.

Implemented
Local network faults were identified and repaired, a new primary provider was selected and the old one retained for automatic failover. The central router was replaced, spare router and switch installed, instructions prepared and failover tested.

Outcome
Outages were practically eliminated. Connection failover takes up to one second; recovery after router failure is about 30 minutes and switch failure about 15 minutes in the planned scenarios.

Story 3. Having a backup does not automatically protect dataRead more

Before
Virtual-server backups were stored on the same physical server, creating a shared failure risk. Some cloud and application data had no independent backup.

Implemented
Storage was restructured; daily backups of 1C databases and virtual servers and weekly backups of the integration server were configured. A separate NAS was placed on another floor and server UPS batteries replaced.

Outcome
Risks of losing some data and prolonged downtime were reduced. Limitation: independent Microsoft 365 and website backups were still planned at the time of the report.

Story 4. Security without paralysing workRead more

Before
Office, guest and specialist devices shared a network, guest Wi-Fi could access the main network, Microsoft 365 lacked MFA and antivirus management was not centralised.

Implemented
Isolated VLANs, guest and specialist Wi-Fi networks, MFA policies for selected groups and centrally managed workstation antivirus.

Outcome
Reduced risk of unauthorised access and incident propagation. Limitation: MFA coverage is not confirmed for every account.

Story 5. Everyday IT issues and employee productivityRead more

Before
Insufficient Wi-Fi coverage, frequent printing and scanning issues, USB printers dependent on individual PCs and limited remote access to a specialist application.

Implemented
New access points and central Wi-Fi control, clear printer names and spare printers/scanners, network print servers, application access through RemoteApp and a shared software and driver repository.

Outcome
Less everyday downtime and faster resolution of user problems.

Story 6. From reactive support to IT service managementRead more

Before
Requests were lost, statuses and priorities were unclear, regular server checks were not documented and licensing visibility was limited.

Implemented
Daily server-check procedures, failover instructions, infrastructure documentation, checks of standard software keys and activation, and Azure DevOps ticketing.

Outcome
A foundation for systematic IT management. Limitations: ticketing mainly covers longer-term tasks, automatic monitoring alerts were planned and a full software-licensing audit remained incomplete.

Scale of the manufacturing company

As of 31 December 2025, the company had more than 100 employees. It manufactures certified chemical reference materials and develops electronic measuring instruments. Activities include production, interlaboratory comparisons, instrument development, logistics, procurement, sales, finance, accounting and administration.

Infrastructure includes 91 workstations, five connected to laboratory instruments: three chromatographs, a spectrometer and a titrator. There are two physical and eight virtual servers, six local and two external; 20 managed switches, seven Wi-Fi access points, 20 network printers/multifunction devices and two barcode printers.

The company uses 52 Microsoft 365 accounts and five 1C databases. Microsoft 365 and cloud-hosted 1C connect with production and warehouse applications; specialist laboratory and engineering software is also used.

These figures describe the environment on 31 December 2025, not the initial audit. The source does not clearly establish the number of organisational departments. The client is not named in this case study.