Context
A manufacturing and trading group with locations in Saint Petersburg and Petrozavodsk. It had around 30 PCs when the engagement began. Modernisation continued over four years as the company grew threefold.
Infrastructure scale
The inventory lists 70 workstations, including laptops: 44 in the main Saint Petersburg office, nine at production sites and 17 in the Petrozavodsk office. Separate video-surveillance devices are excluded. There are two physical virtualisation hosts, one in each city, with five virtual servers each. A further virtual mail server is hosted by the support company. Total: 11 virtual servers, ten on company sites and one external.
Business need
The company depended on a single Windows server running 1C, files and remote sessions. 1C failures during reporting periods led to penalties. Server, internet and data redundancy were not established. Files were stored on employees' computers and moved manually between cities, creating duplicates and version confusion. Separate accounts and weak documentation complicated support.
What changed
An Active Directory domain and shared workplace replaced scattered resources. Desktop and Documents folders were redirected to the server; work files synchronise automatically between the two cities, with archive copies. Server roles were separated into virtual machines, with mutually redundant services on geographically separated physical hosts. The Petrozavodsk site took over Saint Petersburg server functions in failure scenarios tested by the project team. 1C data received operational and backup copies and access controls. Sites were connected by VPN. Dedicated server space, cooling, UPS and network redundancy were introduced. Software was licensed. Email moved to the support company's resilient service with geographically distributed mailbox-database copies.
Business outcome
Employees gained a shared workspace and access to documents across workstations and sites without transporting USB drives. Work files and 1C data no longer depended solely on one computer. Central management improved control. The Petrozavodsk backup site took over Saint Petersburg functions in tested scenarios. An independent 2015 audit rated the overall IT environment satisfactory and equipment, licences, 1C development and support costs in line with the market.
Story 1. From one server to connected servicesRead more
Before
One physical server combined several critical roles; reliable 1C and file redundancy was absent.
Implemented
Virtualisation, domain infrastructure, cross-site virtual-service redundancy, operational and backup copies of 1C, automatic file synchronisation between cities, and server facilities with UPS and cooling.
Outcome
When the main Saint Petersburg server failed, virtual services at Petrozavodsk took over. The project team tested the emergency scenario and confirmed operability and sufficient inter-office bandwidth for the actual workload.
Story 2. Shared documents instead of USB drives and duplicate copiesRead more
Before
Local desktop storage, manual document transfer between offices, conflicting versions and difficulty replacing a failed PC quickly.
Implemented
Active Directory, network redirection of user folders, shared file storage with automatic synchronisation between cities and archive copies.
Outcome
Shared data is accessible through one workplace, and routine PC replacement no longer requires moving all files from the old disk. The audit confirms central user-folder storage and cross-city synchronisation; no measurements of file-search time savings are provided.
Story 3. Technical modernisation and accountability boundariesRead more
Before
IT depended on individual specialists' knowledge, while the business needed understandable support and development.
Implemented
Central account management, licensed software and workstation antivirus were introduced. The service company used a Service Desk, and 1C projects were agreed and supervised.
Outcome
An independent audit confirmed market-level support and development costs. It also found incomplete documentation, missing backup and recovery procedures, proactive monitoring, shared ticket-registration rules and SLAs. Email lacked spam and antivirus filtering and clear contractual guarantees. Infrastructure projects were not united by a long-term IT strategy.
Management lesson
Modernisation demonstrated the value of a systematic technical approach: disconnected infrastructure became a shared information environment with tested cross-city service redundancy. The independent audit also identified the need for a business-side owner of IT. It recommended an IT Director reporting to the CEO and responsible for strategy, budget, automation, projects and suppliers. This illustrates the distinction between quality IT support and managing IT in the business's interests.